2189883
发表于 2015-12-21
3333333333333333333
ruokechen
发表于 2015-12-21
111111111111111
兰斯洛
发表于 2015-12-21
阿斯顿发斯蒂芬
ace983
发表于 2015-12-21
1111111111111111111
zhx649392548
发表于 2015-12-21
谢谢分享
冥冥自有注定
发表于 2015-12-21
想偷懒于是:-)
whd910105
发表于 2015-12-21
我来看看
鱼先森
发表于 2015-12-21
A: High Operator Costs (High Cost Country) in combination with very low Planned Cycle Time has the best opportunity to use CR B: High Energy Load of Operator is optimum selection of replace manual work by CR
C: Optimum position for CR is in the front of U-cell. Side position lead for wider internal space and/or unbalance of operators.
D: As more manual work (in comparison to operator time) the CR is able to cover, as more is effective
E: Sensitive Processes for Operator but simple or possible for CR
F: LCA solution(s) must be properly negotiate first before the CR installation. G: Substitution of standard automation cells by CR
Yunus
发表于 2015-12-21
1111111111
爱吃苹果
发表于 2015-12-21
1231242414