2189883 发表于 2015-12-21

3333333333333333333

ruokechen 发表于 2015-12-21

111111111111111

兰斯洛 发表于 2015-12-21

阿斯顿发斯蒂芬

ace983 发表于 2015-12-21

1111111111111111111

zhx649392548 发表于 2015-12-21

谢谢分享

冥冥自有注定 发表于 2015-12-21

想偷懒于是:-)

whd910105 发表于 2015-12-21

我来看看

鱼先森 发表于 2015-12-21

A: High Operator Costs (High Cost Country) in combination with very low Planned Cycle Time has the best opportunity to use CR B: High Energy Load of Operator is optimum selection of replace manual work by CR
C: Optimum position for CR is in the front of U-cell. Side position lead for wider internal space and/or unbalance of operators.
D: As more manual work (in comparison to operator time) the CR is able to cover, as more is effective
E: Sensitive Processes for Operator but simple or possible for CR
F: LCA solution(s) must be properly negotiate first before the CR installation. G: Substitution of standard automation cells by CR

Yunus 发表于 2015-12-21

1111111111

爱吃苹果 发表于 2015-12-21

1231242414
页: 99 100 101 102 103 104 105 106 107 108 [109] 110 111 112 113 114 115 116 117 118
查看完整版本: 舞神铁牢宏自用版收藏BY 网通一/二区 李忘生 一六指狂魔一