oraino
发表于 2015-12-21
谢谢分享,十分感谢
我是来打将有的
发表于 2015-12-21
我只是来学习的
阿航
发表于 2015-12-21
{:6_519:}
yw65537328
发表于 2015-12-21
看看看看看~~~~~~~~~~
偉爺
发表于 2015-12-21
sdasdas
kit
发表于 2015-12-21
1111
鱼先森
发表于 2015-12-21
A: High Operator Costs (High Cost Country) in combination with very low Planned Cycle Time has the best opportunity to use CR B: High Energy Load of Operator is optimum selection of replace manual work by CR
C: Optimum position for CR is in the front of U-cell. Side position lead for wider internal space and/or unbalance of operators.
D: As more manual work (in comparison to operator time) the CR is able to cover, as more is effective
E: Sensitive Processes for Operator but simple or possible for CR
F: LCA solution(s) must be properly negotiate first before the CR installation. G: Substitution of standard automation cells by CR
一醉青栎
发表于 2015-12-21
谢谢楼主的分享
llz5962007
发表于 2015-12-21
66666666666666666666666666666666666
风轻
发表于 2015-12-21
{:6_518:}{:6_517:}{:6_518:}